The whole bungalow and extension now has ceilings and insulation (video above shows the insulation being sprayed into the main loft space) .  I'm very excited by this, especially as the insulation nearly didn't happen, causing a day of mind-bending stress when the already stretched final works schedule looked like disappearing into the wind (see http://thewoodlouse.blogspot.co.uk/2013/09/enthusiastic-visitors.html).  That would have made moving in this year impossible.  As it is, with the ceilings up we've entered the next phase of building, and I hope things will come together quite quickly now.

I'm waiting for quotes and potential dates from plasterers to get the ceilings skimmed (which should start soon); the stove will have a chimney and all-being-well a test firing in a couple of weeks; the thermal store (hot-water) tank should be going in shortly, along with pumps for the stove's hot-water-heating system and solar-thermal.  That will leave clay plastering the bales, lime-plastering a couple of exposed brick walls of the old bungalow, insulating and laying the floors, fitting kitchen, and general second fix plumbing and electrics.  Then move in!

Still really quite a lot to do, but it feels like the end is, if not quite in sight, then at least should come into sight soon.  For the inside at least.  Landscaping is a whole other ball game, but crucially can happen once we're living in the place.

A lot of little jobs have happened since I last did a general update, so the photos below are an attempt to cover it all.  I've also made a small start on clay plastering but will save those photos for a more specific post on clay-plaster when more of it is underway.  I hope that will be soon, so once again: if you or anyone you know might be interested in playing with clay and straw, learning a bit about clay-plaster, and helping me plaster the walls at the same time - please let me know (email johnbeebutler @ gmail . com   - without the spaces).

Bath full of lovely clay slop.  This time for the first clay coat on the straw.

And there it is.  The "reveal" coat on the walls (so called because it reveals all the uneven bits and hollows, which will be filled-out soon).  Also called key-coat, as it provides an excellent key for the body-coat of plaster to stick to.

MVHR - Mechanical Ventilation with Heat Recovery - in kit form.  Bends, T's, reducers and connectors.  All numbered, with matching numbers on the ducting plans.  One big 3-D jigsaw, to be assembled in a variety of awkward, confined and spidery spaces.  I didn't especially enjoy this bit.  A friend called it the Tube Monster, and the name stuck.  I found thinking of it as The Tube Monster and the Tentacles of Doom somehow helped.

The straight ducts for the MVHR

And the silencers, to cut-out any fan noise and prevent "cross-talk" - sound transmission between rooms.  The product code for the silencers begins SHUSH which I found pleasing.

An MVHR supply duct in place.  I've since taped it to the plasterboard, to ensure airtightness where it goes through the ceiling.

The Tube Monster extends it's Tentacles of Doom through from the loft, into the bale extension

Cables and pipes, waiting for a dividing wall.  Thankfully I only need to know what the pipes are for.  The cables are for the electrician to worry about.

More Tentacles of Doom

Through-the-wall silencer, taking the air exhaust duct to the great outdoors.

Intake and exhaust duct grilles.  The bungalow has eyes.

The heat-recovery unit (heat exchanger and low-wattage fans), with (from left to right) extract air from wet rooms, supply air to rooms, exhaust to outside, and intake from outside (doubling back over the top of the unit).  These will all need insulating.

These poppies really were this bright.  In the area previously known as the front lawn.

Also out front - this is what our home is built from!  Wheat straw.

The cable/pipe mess from back up the page, contained in a freshly-plastered wall.

Chamomile drive.

Utility room, plastered and painted, ready to receive thermal-store tank, pipework and pumps.  I think I did okay on the walls but the ceiling's a mess.  Very satisfying to have a finished room though, complete with window sill.

Reed mat on timber-frame wall (sound insulated with thermafleece sheepswool), meets strawclay wall.  Whole lot will be covered with clay-plaster before too long.

The toilet to be.  Awaiting plaster.  And toilet.

Rain Director and pipes supplying rainwater to the header tank in the loft and on to the loos.  Also mains backup.  The unit runs the pump in the underground tank when the header tank is nearly empty, and turns it off when full.

Fitting VCL (vapour control layer)/airtightness-membrane (recycled paper) to the big-room ceiling.  To keep moisture-vapour out of the insulation, and stop heat-loss through air-movement.

Counter-battens hold the membrane in place, holding back the insulation when it's pumped in, and allowing for it to bulge a bit without stopping us fitting plasterboard later.

The first bit of Warmcel (recycled newspaper) insulation is pumped in.

White-wrapped bales of insulation, and the pumping machine.

The bellybutton fluff of a giant (aka: Warmcel)

Tim and Mike chasing the insulation installers out of the building, boarding the ceilings up behind them (we got Tim and Mike back to speed things along.  I'd forgotten how nice it is having them around).

Bedroom ceiling! (with clay plaster tests on reed mat)

We have ceilings throughout the bungalow.  This is amazing.

Looks like the contents of a billion hooverbags, but that there is 400mm of quality insulation in the loft.  The MVHR ducts still need to insulated.